electric_bolt VoltVision

Grid Inspection Platform

INSPECTION REPORT

#VV-2023-26

Inspector

Soumya Modi

ID-442

Date

Oct 24, 2023

09:15 AM PST

Location

Sambalpur University, Jyoti Vihar, Burla, 768019

34.05° N, 118.24° W

Asset ID

Tower 4B

High Voltage Link

Executive Summary

Total Issues

12

Critical

2

Warnings

3

Passed

7

Detailed Visual Analysis

High-resolution aerial inspection of power tower
photo_camera Primary Asset View

Tower 4B: Upper Insulator Assembly

broken_image Corrosion Detection

## No Corrosion Detected

forest Vegetation Risk

low

cable Line Integrity

No Breakdown

broken_image Pollution Detection

No Pollution Flashover

broken_image Insulator Detection

Pin Insulator
Final Verdict
build_circle Maintenance Required

Based on the identification of critical faults, immediate maintenance is recommended within 48 hours to ensure grid reliability and safety standards compliance.

Digital signature of inspector

Authorized Signature

Inspector Soumya Modi

Generated by VoltVision AI Engine v4.2

Page 1 of 1