electric_bolt VoltVision

Grid Inspection Platform

INSPECTION REPORT

#VV-2023-9

Inspector

Soumya Modi

ID-442

Date

Oct 24, 2023

09:15 AM PST

Location

Sambalpur University, Jyoti Vihar, Burla, 768019

34.05° N, 118.24° W

Asset ID

Tower 4B

High Voltage Link

Executive Summary

Total Issues

12

Critical

2

Warnings

3

Passed

7

Detailed Visual Analysis

High-resolution aerial inspection of power tower
photo_camera Primary Asset View

Tower 4B: Upper Insulator Assembly

AI Confidence Score
Crack Detection 98%
Vegetation Risk 92%

broken_image Crack Detection

## No Corrosion Detected

Micro-fracture detected on the primary ceramic insulator arm (Section B2). Thermal imaging suggests stress concentration. Immediate replacement recommended.

Length: 4.2cm
Temp: +15°C Δ

forest Vegetation Risk

Warning

Overhanging oak branch detected within minimum clearance zone (Sector 7-North). Proximity is 1.8m, violating 2m threshold.

Gap: 1.8m
H: 12m

cable Line Integrity

Stable

High-resolution scan of main transmission cables shows minimal oxidation. No fraying observed. Integrity remains at 99.5%.

  • check_circle No visible fraying
  • check_circle Minimal oxidation
Final Verdict
build_circle Maintenance Required

Based on the identification of critical faults, immediate maintenance is recommended within 48 hours to ensure grid reliability and safety standards compliance.

Digital signature of inspector

Authorized Signature

Inspector Soumya Modi

Generated by VoltVision AI Engine v4.2

Page 1 of 1